July 5th, 2003

Morgan Webb 2

A decking we will go...

Just an state of update...

We're in the middle of building a two-level deck for our townhouse. We gotten the top level built out with a surface to walk on but no railings.

We're putting railings up next. Afterwards, we're work on the bottom deck/patio, followed by a staircase to connect the upper with the lower.

Long Fence had quoted us a cost of $7,500.00 to complete this task. So far, we've spent about $750.00 in decking material for the upper deck and railings and about 2 days (building and material fetching).

More to follow.